Subtotal
—
Before contingency & VAT
Contingency
—
10% allowance
Total (incl. VAT)
—
Live all-in estimate
Breakdown
Category | Quantity | Unit | Unit cost | Line total |
---|---|---|---|---|
Subtotal | — | |||
Contingency | — | |||
VAT (20%) | — | |||
Grand total | — |
Notes & assumptions
- New‑build core uses a per‑m² allowance for shell + standard finishes. Edit to match spec and quotes.
- Extension cost assumes single‑storey mid‑spec; change unit rate for double‑storey or premium finishes.
- Painting area is floor m² × factors (walls & ceilings). Adjust factors for your design and ceiling heights.
- All costs are indicative UK averages (Oct 2025) and exclude professional fees (architect, QS, engineers), planning, utilities upgrades, abnormal groundworks, and furniture/appliances unless included in your unit rates.